Back to all reports

Outside Enfo Barn and Raywood House

Reported in the Blocked drain category anonymously at 17:11, Tuesday 9 June 2020

Received by Buckinghamshire Council moments later

Water coming out of two drainage lids and running through drive entrance of Raywood House, rather than through the drainage tunnel.

Some water through drainage tunnel but not enough to support flow (blockage/ low capacity?). Surface water covers the width of the road during moderate /heavy rain fall

Flooded Gate electronics. Also eroding garden planting and public footpath which was relaid in 2018

Surface water from Dunton Road and South Lane plays a part in surface water volume.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Thank you for your report which is currently under review.
    We will investigate this and if you have provided an email address, we respond to you within 10 working days.
    We will continue to update you by email (if provided) when your report reaches key stages.
    IMPORTANT: To report anything dangerous, please call us on: 01296 382416 (09:00 – 17:30 Mon-Thurs, 09:00 – 17:00 Friday) or 01296 486630 (out of hours and weekends).
    Regards
    Transport for Buckinghamshire

    Posted by Buckinghamshire Council at 17:12, Tuesday 9 June 2020

  • Thank you for your report.

    We have recorded it and will consider it when we are planning future works in the area. Please note we work on a priority based risk matrix in line with our Highway Inspection Policy and therefore programme times can change due to priority based working.
    Our Highways Inspection Policy can be accessed via the link below;
    www.buckscc.gov.uk/highwaysinspectionpolicy
    Regards
    Transport for Buckinghamshire

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 13:35, Thursday 11 June 2020

Only the original reporter may leave updates. If you made the original report please log in to leave an update.